Negotiable
With a heavy hearth. Decided to finally(not in a hurry though)
Reason : really dont have time to fix everything.
Run down of repairs done since Jan 2018;
1. 2 new front tires
2. bnew baterry
3. polish and paiting of mags
4. bnew 3row radiator
5. aircon repair
6. brakeline repair
7. fuel line repair
8. alternator repair
9. re-upholster ( except original leather seats)
10.window sill repair/ rubber replacement
11. sparkplug replacements and tuning
12. door allingment
13. replacement of fender mirror
14. gauge repair
Issues/plans:
upgrade the suspension
paint is still ok but parang makapal masilya.
electrical can be improved(aesthetics)
unit is in las pinas. PM your questions n lang